Sold: This item has sold and is no longer available.
2014 JOHN DEERE 850K LGP CRAWLER PIPELAYER
EQ2063
Photo taken 01.19.2021 with 1966 hrs
Disclaimer: Actual listing attachments and options may vary from photo.
Sold: This item has sold and is no longer available.
2014 JOHN DEERE 850K LGP CRAWLER PIPELAYER
EQ2063
Year
2014
Hours
2,304
Make
JOHN DEERE
Model
850K LGP
- Description -
Experience unmatched productivity and efficiency with this 2014 John Deere 850K LGP Crawler Pipelayer. Designed for heavy-duty pipelaying operations, this robust machine can tackle even the toughest job sites with ease. With only 2,304 hours on the meter, this low-hour unit is ready to deliver exceptional performance for years to come.
Key Benefits:
1. Maximize Project Profitability: The 850K LGP's powerful and efficient operation minimizes downtime, reducing overall project costs and boosting your bottom line. 2. Enhance Worker Safety: The spacious cab and intuitive controls provide excellent visibility and ergonomics, ensuring a safe and comfortable working environment for operators. 3. Versatile Performance: With its impressive lift capacity and durable undercarriage, this pipelayer can handle a wide range of pipe sizes and terrain conditions, making it a valuable asset for any construction operation.
Unique Features:
This John Deere 850K LGP Crawler Pipelayer stands out with its low ground pressure (LGP) design, allowing it to operate on soft or sensitive terrain without causing excessive disturbance. The robust undercarriage and efficient hydraulic system ensure smooth and precise pipe placement, while the ergonomic cab offers exceptional operator comfort and control. With its proven John Deere reliability and durability, this pipelayer is built to tackle the toughest challenges on your job site.
Don't miss this opportunity to own a well-maintained and low-hour 2014 John Deere 850K LGP Crawler Pipelayer (Stock Number EQ2063) at an attractive price of $155,000. Contact us today to schedule a viewing and take the first step towards maximizing your pipelaying productivity.